Special alloy manufacturer & exporter · Shanghai, China

[email protected]  |  +86 15618279078  |  WhatsApp

Forged flanges in nickel alloy and stainless steel stacked after machining at Shanghai Hangbo Alloy Group Weld neck flange in a nickel-based alloy with a machined raised face and drilled bolt holes Concentric reducers in nickel alloy and stainless steel after dimensional inspection Butt weld equal tee to ASME B16.9 in nickel-based alloy with bevelled ends

Quality & certifications

Proof, not promises: how Hangbo controls and documents alloy supply

Certified to ISO 9001:2015, GB/T 19001-2016 and GJB 9001C-2017, with heat-number traceability and EN 10204 3.1 certificates issued from our own test results.

In-house testing capability

Testing performed before release
Test or controlWhat it provesTypical standard
Optical emission spectrometryFull elemental composition of the heatASTM E1476 / mill procedure
Tensile testingYield, tensile strength and elongation at room and elevated temperatureASTM E8 / E21
Charpy impactToughness at the design minimum temperatureASTM E23
Hardness testingHeat treatment condition and sour service complianceASTM E10 / E18
Ultrasonic testingInternal soundness of bar, forging and plateASTM A388 / A578 / EN 10308
Eddy current testingSurface breaking defects in tube and pipeASTM E426
Hydrostatic testingPressure tightness of pipe and fittingsASTM B829 / applicable product spec
Intergranular corrosionSensitisation control in stainless and nickel gradesASTM G28 Method A, ASTM A262 Practice E
Positive material identificationCorrect grade actually installedHandheld XRF with documented calibration

Certificate types explained

Choosing the right certificate
CertificateWhat it meansWhen to specify
EN 10204 3.1Manufacturer declaration with actual test results from the heat lotStandard supply for all orders
Third party test report (SGS)Independent inspection, sampling and laboratory report issued by SGS or another recognised third party agencyCritical service, regulatory and most EPC projects
Mill test certificateChemical, mechanical and heat treatment record for one heat numberAlways - request with the order
Heat treatment chartRecorded furnace temperature trace for the batchWhenever properties depend on thermal processing
NDT reportsUT, PT, RT, ET or hydrostatic results against agreed acceptanceWhere the project ITP requires it

Traceability from melt to part

  • Each heat receives a unique number that follows the material from melting through every stage to the delivered product.
  • Markings follow MSS SP-25 so the number remains readable after installation.
  • Cut pieces keep the transferred heat number, supported by a cutting plan when parts are nested.
  • Photographic records of markings are retained before coating or insulation.
  • Consolidated certificate packages are issued for mixed-alloy shipments.

Quality questions

Can you follow our project inspection and test plan?
Yes. Send the ITP with your enquiry and we will confirm coverage, witness points, hold points and document format before order placement.
Do you perform positive material identification?
Yes. PMI can be performed on 100 % of items or on an agreed statistical basis, using calibrated handheld XRF with results reported against the certified ladle analysis.
How do you control heat treatment?
Furnaces are calibrated with instrumentation held to ±5 °C uniformity, every batch is recorded on chart, and mechanical test coupons representing that batch are tested before release.
What happens if a test result fails?
Non-conforming material is quarantined and clearly identified. We notify the customer immediately with root cause, corrective action and replacement plan rather than shipping and hoping the certificate is never checked.
Can you arrange third party inspection?
Yes. We arrange independent inspection, sampling and laboratory testing through SGS and other recognised agencies, and the resulting third party test report is issued with the shipment.

Ready to specify your alloy?

Send us your drawing, material specification and quantity. You receive a formal quotation within 24 hours, including melting route, heat treatment, testing scope and certificate format.